Ya. I knew what I was talking about the whole time as I’m in the construction industry. Gap, reveal, whatever, but I sent you two renderings to show this as well. Is there some reason why you changed this? Just wondering, I don’t think you will change it back but having that gap or reveal is more accurate to the way things are built and for me to show the door in realistic renderings. It was better before, creating a door and saving it isn’t a major deal but it does add more time from the way you had it before.
For the windows. All the windows I had in my model showed the 2D symbol correctly and now they don’t so I don’t have the option to leave them the way they are now but not the way they were unless I draw the window symbols myself or change out all the windows.
My question was whether or not I should expect this after each update so maybe I won’t update until I’m done with a project. I get you have to produce updates and that’s great but if it messes up previous or ongoing projects I need to be prepared.