I typically draw the actual slope over a 12" run.
I missed this new thread and posted an image here;
Yes, if the pitch is greater than 12/12 you would note and draw it as such: 14:12, 18:12, etc.
I typically draw the actual slope over a 12" run.
I missed this new thread and posted an image here;
Yes, if the pitch is greater than 12/12 you would note and draw it as such: 14:12, 18:12, etc.