5D+ Plus - Flexible Documentation For Architects

Part 3 — Why are 5D+ Dimensions & Annotations made of real geometry?

A technical decision that came from a decision about experience

When I started building the Dimension and Annotation tools for 5D+, there was a fairly natural technical choice:
Draw them as overlays, or render them inside a web-based interface.

The plugin could simply calculate the positions and then render the symbols, text, dimension lines, and other graphics on the screen.

This approach has many technical advantages. But I chose not to do it.

I wanted 5D+ Dimensions and Annotations to become entities that have a real presence inside SketchUp space.

Not because I wanted to make things more complicated. But because of a principle I had from the beginning:
Architects should feel like they are directly working with their drawings.

A dimension beside a wall should feel like it is actually there, beside that wall.

I want to be able to select it. Touch it. Drag it.
I want to see it in direct relationship with the model.
When I change the view or modify the building, it should still belong to that same world.

To me, annotations are not a user-interface layer sitting on top of the architecture.
Annotations are part of the space we use to describe the architecture.

Of course, this decision created many difficult problems later:
Scale, camera, orientation, clipping, reflected ceiling views, sections, exporting…

But I still kept this approach.

Because if I solved everything with overlays, I might solve some technical problems much faster…
but I would lose the thing I wanted to protect from the very beginning:
Touch & Feel.

And this is also an example of how I develop 5D+.

Not:
We have technology A → let’s find somewhere to use A.

But:
I want architects to have experience X → now, how can I build the technology that makes X possible?

Next: “Draw First. Define Later.” — and why I don’t want to turn SketchUp into another Revit.

Part 4 — Draw First. Define Later.

There is one question I often get while developing 5D+:

Why not build Wall, Floor, Roof, Door, Stair tools… and turn SketchUp into a complete BIM application?

I have thought about this direction for a long time, but I intentionally chose not to follow it.
The reason is not whether it can be done.

It comes from a different question:
Should architects start the design process by thinking about the building, or by thinking about the tool used to create the building?

This is where one of the most important principles behind 5D+ came from:
Draw First. Define Later.

When we have to define before we draw

In many traditional BIM systems, we usually start by deciding what we are going to create.

Want to draw a wall? Choose Wall.
Want to create a floor? Choose Floor.
Want to place a door? Choose Door.

Then choose the type, structure, thickness, material, elevation, parameters… and finally start drawing.

This is a very logical approach, and it has many advantages. As soon as an object is created, the software already knows what it is and what information it should contain.

But from the perspective of someone who has worked as an architect, I have always felt there is one small problem:

Sometimes we have to define an idea before we have really explored it.

During the technical stage, this makes perfect sense.

But during the creative stage, architects do not always know what the thing they are drawing will eventually become.

Sometimes I just want to draw a line, Push/Pull a face, move a volume, cut something, copy something, and try another shape.

It might become a wall, a roof, a screen, a structural element, furniture — or simply a study mass.

I don’t want to decide that yet.

This is one of the things I really love about SketchUp:

SketchUp lets us create geometry before asking us to explain what that geometry is.

To me, this is not a limitation.
It is one of SketchUp’s greatest strengths.

I don’t want to turn SketchUp into another Revit

If I built Wall, Floor, Roof, Door tools… and attached parameters to every type of object, eventually 5D+ could become a fairly complete object-based system.

But Revit and Archicad already do this very well.

What interests me more is a different question:

Can we build a powerful BIM and documentation workflow while still keeping the freedom that makes SketchUp special?

So instead of:
Define → Select Tool → Set Parameters → Draw

I prefer:
Draw → Explore → Define → Classify → Document

Architects can simply draw first.

Use SketchUp’s native tools, Dynamic Components, plugins from any developer, or geometry imported from somewhere else — 5D+ does not need to care how you created it.

Once the idea starts to take shape, then we can ask:

Is this a Wall or a Slab?
Which Storey does it belong to?
What is its Classification or IFC Type?
What Material does it use?
Should it appear in schedules?
Does it need labels, dimensions, or documentation?

Instead of asking the creative process to serve the data structure, I want:

The data structure to come later and serve what the architect has created.

That is what Draw First. Define Later. means to me.

“Define Later” does not mean “Don’t Define”

I am not against BIM, classification, or structured data.
In fact, 5D+ has many tools for exactly those things.

The difference is simply when they happen.

Create first.

When something starts to have meaning, define it.
When it needs to be documented, standardize it.
When data needs to be exchanged, classify it.
When BIM information is needed, add it.

Definition does not disappear. It simply comes at a more appropriate time.

And this leads to another principle:
5D+ does not need to own the modeling process.

If you like Profile Builder, use Profile Builder. If you prefer Dynamic Components or another wall modeling plugin, keep using them. If you prefer SketchUp’s Line, Rectangle, and Push/Pull tools, that is perfectly fine too.

Use whatever tool helps you think fastest.

5D+ should focus on understanding, defining, organizing, and turning what you have created into information and technical documentation.

“All-in-one” doesn’t have to mean “do everything”

I have no ambition to build every tool an architect could possibly need.

SketchUp already has a huge ecosystem, with many developers who are very good at solving specific problems.

So I don’t want 5D+ to become:
A plugin that contains every tool.

I want it to become:
A system that can connect what architects create into one unified workflow.

Those are two very different meanings of “all-in-one.”

And AI may make this philosophy even more interesting

When I first started thinking this way, AI was not a central part of the idea.

But over time, I have started to see that Draw First. Define Later. may fit the future even better than I originally expected.

In the future, geometry may come from architects, AI, generative tools, scans, point clouds, scripts, plugins, or methods that do not even exist today.

If a system requires everything to be created using its own object tools, it has to control the creation process.

But if a system can look at something that already exists and:

Understand → Define → Classify → Connect Data → Document

then where the geometry came from becomes much less important.

This is also one of the reasons I am moving 5D+ toward an API and future AI interaction.
Maybe one day, users will not even need to know which tool to click in 5D+.
They will simply say what they want.

Finally

I don’t believe Draw First. Define Later. is the right approach for everyone.

There are projects and organizations where defining objects very strictly from the beginning is necessary and effective.

I am simply choosing a different direction — one that feels closer to how I experience the architectural design process:

Don’t make creativity wait for data.

Let the idea take shape first.

Then we have plenty of tools to turn it into something accurate, structured, and ready for documentation.

And perhaps this is still the question that guides the development of 5D+:

How can we make SketchUp more powerful for BIM and documentation, while still keeping the reason we loved SketchUp in the first place?

Next: Model Data ≠ Project Data — Why I don’t think all project data should live inside the model.

Heyy ! super inspiring !!
I’m currently trying out Paper, and i can’t figure how to rotate text in paper ?? Could you help me ?

Best Regards

Thank you.
I’m developing to support rotated text in Paper.

Part 5 — Model Data ≠ Project Data

Why I don’t want all project data to live inside the Model

In the previous part, I talked about Draw First. Define Later.

But as I went deeper into BIM, I came across another question:
After we define things, does all that information really need to live inside the Model?

This is where I started separating two concepts:
Model Data and Project Data.

The Model doesn’t need to know everything

A common idea in BIM is:
The more information the Model contains, the better.

A wall is not just geometry. It can also contain Material, Fire Rating, Cost, Manufacturer, Status, Classification, Specification…

Eventually, the Model becomes the Single Source of Truth.

In theory, this is a beautiful system.
But in real projects, I started to see a problem:
Who is going to update all those “Truths”?

After a project meeting:
The Owner may change a decision.
The QS updates the Cost.
The Supplier changes a Product Code.
The PM updates the Approval Status.
The Consultant updates information under their responsibility.

All of these are Project Data.

But if everything has to live inside the Model, that information often has to go through someone who knows how to work with the Model.

And very often, that person is the architect or BIM modeler.

Then we have a problem:
The person who has the authority to decide the data is not always the person who can update the data.

We create a central source of information, but at the same time, we may accidentally create a central data bottleneck.

Model Data ≠ Project Data

So I started asking a different question.

Not:
How can we put all the data into the Model?

But:
What information actually needs to be in the Model?

Geometry, location, dimensions, spatial relationships, classification, and information directly needed for drawings, coordination, quantities, IFC, documentation…

These are things the Model should do very well.

But Cost, Approval Status, Supplier, Delivery Date, Responsible Person, Procurement Status…
They are very important to the Project.

But they do not always need to live inside the Model.

For example, a door may have the ID:
DOOR-023

Inside SketchUp, it has geometry, location, dimensions, and the information needed to create drawings.

In Project Data, the same DOOR-023 may have Cost, Supplier, Approval Status, Delivery Date…

Both systems are talking about the same door, but they don’t need to store everything in the same place.

The right people should update the right data

This is what matters more to me.

If Project Data lives in a system that different project members can access:
The QS updates Cost.
The Supplier updates Product Code.
The PM updates Status.
The Owner approves a selection.

They don’t need to know what Push/Pull, Components, Tags, or even SketchUp are.

They only need to understand the data they are responsible for.

I don’t think architects should become the Data Entry Operators for the entire project simply because they are the ones who know how to open the Model.

Single Source of Truth doesn’t mean Single Place for Every Truth

I still like the principle of Single Source of Truth.
But I think about it a little differently.

Not:
One Model contains everything.

But:
Every piece of information has one trusted source — and everything is connected.

Geometry has its source.
Cost has its source.
Procurement has its source.
Approval has its source.

The Model doesn’t need to know everything.

It needs to be properly connected to the things it needs to know.

This is also why I have been developing things like Data Bridge, Auto Info, Classification, IFC, External Data, and eventually APIs.

Not to keep putting more and more data into SketchUp.
But to allow SketchUp to participate in a data ecosystem bigger than itself.

From Model-Centric to Project-Centric

I don’t believe this approach is necessary for every project.

A small project can keep everything inside the Model. There is no reason to create extra complexity just to call something BIM.

But when a project becomes large enough, involves many different parties, and its data changes constantly, I believe the data architecture should allow:

The right people to update the right information without creating a bottleneck.

If Draw First. Define Later. is about keeping data structures from getting in the way of creativity…

then Model Data ≠ Project Data is about keeping the Model from becoming a bottleneck for collaboration.

The Model is still extremely important.

But instead of:
One Model knows everything.

I want to move toward:
One Project connects everything.

Perhaps this is the simplest way to describe the direction I want to take 5D+.

Next: The Drawing Is Not the Final Product — Why I see PDF, DWG, and IFC as outputs generated from Geometry + Project Data.

This are all very well thought out arguments! And I agree with all of them! Keep them coming!

Hi @Cyentruk, - Is there a way to keep the instance name of a group when I classify it? I am trying to combine Medeek plugins with 5D+ and it looks like when I classify the group, it strips the group of its instance name, which Medeek uses for its parametric algorithms. It is still broken when I copy and paste the name into the instance text box. Medeek leaves the outer group of the wall untagged, so I can manually tag it as 3.LEVEL 1, go into that group and group everything as A.WALL, or group a bunch of walls together and the wall still functions parametrically, but using the 5D+ buttons seems to destructively alter the Medeek code.

Zooming out, I love the writing. I am with you all the way. I am switching from 15 years of revit to an all sketchup workflow for just this reason: sketchup allows for more creative thinking, drawing, and modeling. There is also a vibrant community of people like you adding to the ecosystem to make it a powerful and complete professional workflow.

I enjoyed reading through your process. Your framework creates a clear drawing communication vs project communication balance. Not everything has to be in or on the drawing.

This is the core problem with the 3d model or the digital twin as the single source of truth. I really like the idea of 6D drawings where the 3 model links to a Gannt chart timeline. Have I have seen a 3d model updated with 6D information, when construction was underway - negative.

Here I think Trimble ProjectSight can play an important role as well. Until I attended the Trimble Dimensions conference, I wasn’t even aware that something like this existed. When I saw it as a dashboard with access to drawings, specifications, and photos on the exhibition floor, I understood how this was a project management tool rather than a drawings-only tool. This is where I think you make a very valid point: the project data connects everything, and we should be project-centric instead of model-centric.Curic Publish is an early Trimble Projectsight is guess..

5D+ Plus v3.0.0 Beta 9 is now live for testing.
One of the more unique additions in Beta 9 is LayOut file interoperability.

5D+ Paper can now import LayOut files and export Paper Sheets back to LayOut, making it easier to reuse existing work and move between the two environments.

This gives users more freedom to choose where they want to continue editing and documenting.

Full release notes: 5D+ PLUS BETA - RELEASE NOTES

Thanks Joshua! I really like your distinction between drawing communication and project communication. It actually helps me explain my own thinking more clearly.

And yes — project-centric instead of model-centric is exactly the direction I’m thinking about. Not everything needs to be inside the model or on the drawing; it just needs to be properly connected to the project.

Thanks for adding another piece to the idea!

Thanks for reporting. The classification of 5D+ has a function to automatically create an outer group for selection if user checking to the Storey checkbox when classifying. But the instance name is cleared that proved there 's bug else where. Let me check and fix this in the next version (v3.0.0)

This version also fixed the issue of changing size for dimension in ft/in.

Thank you @Cyentruk ! I see that the imperial dimensions now works.

Part 7 — The Paradox Called 5D+ Paper

Why did someone who didn’t like Paper Space end up building… Paper? :grinning_face_with_smiling_eyes:

From the beginning of this series, I have talked quite a lot about why I don’t like the separation between Model Space and Paper Space. I built 5D+ so architects could keep documentation as close to the Model as possible. Dimensions, annotations, grids, labels, symbols… can all be created and edited directly inside SketchUp.

And yet, I eventually built something called 5D+ Paper. :grinning_face_with_smiling_eyes:

It sounds a little contradictory, but I have never denied the importance of Paper. In the end, we still need drawing sheets, title blocks, scales, layouts, PDFs, and printed drawings. Those things are necessary.

“What I don’t like is the disconnection.”

When working in SketchUp, I am looking at and interacting directly with the building. I adjust a wall, orbit around the model, change a section, drag a Label, or edit a Dimension. This is what I described earlier as “Touch & Feel.”

But then the traditional workflow takes the architect into another space to continue the documentation. The building becomes a Viewport, and the things we were directly interacting with are now seen through a “window.” It is still the same project, but the feeling and the flow of work have changed.

That is the problem I wanted to solve.

After two years of developing 5D+, users can now create plans, elevations, sections, details, dimensions, annotations… directly inside SketchUp. But then a very practical question appeared:

“OK guys. Now how do we put all of this onto an A1 sheet?” :grinning_face_with_smiling_eyes:

Obviously, we still need Paper.

But I don’t want the workflow to become:

Model → Layout → Add Dimensions → Add Annotations → Present the Drawing.

If that happens, I am simply rebuilding the same disconnection that 5D+ was created to avoid.

The plan already exists. The section already exists. The dimensions and annotations already exist. Paper doesn’t need to recreate them. Paper just needs to organize them.

Of course, Paper can still contain Text, Lines, Tables, Diagrams, or other 2D information that doesn’t need to exist in the Model.

So I set a fairly simple boundary:

Model is where we Design → Define → Describe the design with Dimensions and Annotations.

Paper is where we Layout → Arrange → Present → Publish.

And while developing 5D+ Paper, I also started to understand my own idea of “One Creative Space” a little differently.

Before, I thought it was close to saying that everything should stay inside the Model. Now I think what matters more is “one continuous flow of thought.”

Architects can move from 3D to a drawing sheet, from design to presentation. The working space can change, but the creative flow should not be interrupted.

Next: When the final goal is… that users don’t need to know how to use 5D+ — From Tools and APIs to MCP and Prompt-Driven Workflows.

Regarding - Model Data ≠ Project Data: I 100% agree on your analysis. Especially the part of the knowledge needed to update a model with information becoming a chore of the “best Sketchup guy” not the “best information guy” being a big hurdle.

I don’t want to put stuff into the model for other people because they cannot figure out how Sketchup works. But with “One single source of truth” this is the only way.

Now if we disconnect that, as you propose, we solve that problem. BUT we create a ___load of new problems that I haven’t figured out how to solve yet. The problem lies in the “pairing” of information. You have doors in the model, theses doors have some sort of identifier. Perfect - now you just need to add that identifier to some mysterious SIMPLER data-information management system. An ERP I assume? A collection of Excel Sheets? Who knows. Not solved. But now comes the tricky bit. The non-Sketchup-Person is adding BIM information in that mysterious system, while you have your next client meeting, resulting in one of the 5 doors being changed to 4 doors of the old type and 1 door of a different type plus a brand new door because - why not. That’s how projects evolve. How to we rematch that. It gets worse. I am just finetuning a set of drawings that have been evolving over the past 8 month. We are about to build it, so I am cleaning it up. Since it had so many iterations, most of the identifiers are “weird”. You have DoorTypeA, B, D, F, G because the other types are no longer in the model: C was there at one point or the other but is not needed any more. So instead of giving out an awkward list I am renaming them: A,B,C,D,E - much better. :slight_smile: But now the identifier is messed up, and the mysterious “other” system matches the wrong doors to the wrong information.

It goes the other way around to. The non-Sketchup guy is adding parts into the MysteriousSystem™ . What happens with that? The model doesn’t know about it. Sometimes that’s good (paint). Sometimes it’s bad (an airconditioner that you didn’t drawn, that is needed and that DEFINETLY needs to be added back the model).

I basically think you are right with your approach, but I do not know how it can actually be solved. Having said that we will actively exploring this because it needs solving. Curious about your methods OUTSIDE of Sketchup

This video is set to private? :thinking:

2nd video is set to private? :thinking:

videos set to private? :thinking:

Yes, some videos are set to private.

So i’ve noticed :innocent:

2 Likes